filtec header
 

Projects and Engineered Systems completed by Filtration Technology

Projects

Select from the list below
Auto Poly Prep System and Dosing
Eltham WTP Upgrade
Matarangi Beach Estates
Te Aroha WTP Upgrade
Trojan UV - Hamilton
Waikouaiti Membrane Filtration Upgrade
West Taieri Membrane Filtration Upgrade

Trojan UV - Hamilton

Installed and commissioned in June 2006, these Trojan Swift 24 units have now been operating for over 2-years and have proven to be very reliable.
The medium pressure UV systems have just recently had their first lamp change after the manufacturers recommended End of Life (in hours) had been exceeded.
Back-up, prompt service and reliability of installed equipment are key performance criteria for Filtec when supporting our customers. Part of the service is regular visits to site to complete, and record, the monthly UV Intensity Sensor Reference checks. These checks are required to comply with the NZ Drinking Water Standards, and thus ensure the water supply is safe to drink.

 

 

Search our site
site search by freefind
Copyright Filtration Technology Ltd 2009 All rights reserved.
Designed & maintained by Ad-Vent Marketing Ltd